2025-06-14
Precautions for installation of large-diameter fully welded ball valves
When installing large-diameter fully welded ball valves, attention should be paid to key aspects such as pipeline pretreatment, lifting operations, welding specifications, and subsequent inspection and maintenance. The specific steps are as follows:
1. Pipeline inspection and pre-treatment: Before installation, it is necessary to ensure that the interior of the pipeline is clean, free of impurities, rust, etc., to prevent foreign objects from entering the valve. At the same time, it is necessary to check the size and positional errors of the pipeline to ensure that it matches the connection port of the ball valve.
2. Valve lifting:
The lifting rope should be tied to the lifting ear (ring) or flange on the valve body of the ball valve, avoiding tying it to the handwheel